Email Address enquiry@pellet-richi.com

Phone/Whatsapp 0086-13838389622

NEWS CENTER

THE FRESHEST GROUP DYNAMICS,THE MOST CUTTING-EDGE INFORMATION, ALL IN HERE

Based on the major needs of the industrial Internet era, Richi Machinery will provide higher intelligent technology and high-quality services in the feed, biomass energy, and organic fertilizer industries. It will focus on supporting the development of the manufacturing industry with industry chain partners to help customers achieve higher and faster value growth.

NEWS

Industry News

Follow Richi Machinery trends, collect industry information, and discuss market focus.

Investment Cost and Floor Space of Premixed Feed and Feed Additive Production Line Project

  • Date: 2020-11-26 08:41:35
  • From: www.pellet-richi.com
  • Clicks:

Feed additives and pre-mixed feed are essential raw materials in the animal feed pellet production line. They can strengthen the nutritional value of pigs, cattle, sheep, poultry, and animal feeds, improve the production performance of pigs, cattle, sheep, poultry, and animals, and ensure that pigs and cattle , Sheep, poultry, animal health, saving feed costs, and improving the quality of livestock products have obvious effects. What is the investment cost and floor space of the premixed feed and feed additive production line project? Today we will analyze the investment cost and floor space as well as the type of equipment required in the production process.

Investment Cost and Floor Space of Premixed Feed and Feed Additive Production Line Project
Investment Cost and Floor Space of Premixed Feed and Feed Additive Production Line Project

1. Project Content and Construction Scale of This Project

(1) Project content

Project name: A construction project with an annual output of 1,000 tons of premixed feed and 200 tons of feed additives;

  • Construction nature: new construction;
  • Construction site: Yueyang City;
  • Total investment: 10 million RMB;
  • Environmental protection investment: 350,000 RMB;
  • Production scale: 1,000 tons of pre-mixed feed and 200 tons of feed additives;
  • Number of employees: 15;
  • Production system: 300 days of production per year, 8 hours per shift,.

(2) Construction content

The construction content of this project includes a factory building with three floors, covering an area of ​​531.6m2 and a building area of ​​1594.7m2. The specific composition of the project is shown in Table 1 below.

Table 1 List of main components of the project

Engineering category project name Engineering Content Production function Remarks
structural work Factory floor The area is 531.6m 2 Production area New
Warehousing engineering Second floor of the plant The area is 531.6m 2 Storage of finished products and raw materials New
Auxiliary engineering Three floors of the plant The area is 531.6m 2 Laboratory (quality inspection, weighing, etc.), comprehensive office, staff rest area New
Public works powered by Power grid supply in Pioneer Park \ New
Water supply Piping Park Water Pipe Network Supply \ New
Environmental Engineering Waste gas treatment facilities Unorganized dust The impulse bag filter that comes with the machine is used as the main dust collection treatment, and the remaining dust is treated by a mobile dust collector, and then the workshop is ventilated Meet the standard in Table 2 of "Comprehensive Emission Standard of Air Pollutants" (GB16297-1996) and the corresponding unorganized emission monitoring concentration limit: 1mg/m 3 New
Noise control facilities Equipment shock absorption, sound insulation, greening Reduce noise during operation New
Wastewater treatment facilities Domestic sewage, laboratory cleaning instrument wastewater Integrated wastewater treatment facility (four grid pool) Project sewage cleaning equipment with water after the integration of wastewater treatment facilities (four-frame pool) processing, ① before Xiangyin Hunan Jinlong Industrial Park District sewage treatment plant is not running, the sewage projects to achieve "Integrated Wastewater Discharge Standard" (GB8978-1996) in After the sewage treatment plant in Jinlong New District of Hunan Xiangyin Industrial Park is operated, the sewage from the project will enter the sewage pipe network of the park after the sewage treatment plant in the Jinlong Town Sewage Treatment Plant reaches the water intake standard of the Jinlong Town Sewage Treatment Plant. Sewage treatment plant in Jinlong New District, Yin Industrial Park. Rely on
Solid waste treatment facilities Garbage pool Cleared regularly by the sanitation department Rely on

2. Product Plan

The construction unit has an annual output of 1,000 tons of premixed feed and 200 tons of feed additives.

Table 2 List of product solutions

Serial number name Quantity Performance parameter
1 Premixed feed 1000t It is made up of natural plant extracts and auxiliary materials such as bran and wheat bran in a ratio of 1:9, which contains 100 tons of extract per year and 900 tons of bran per year.
2 Feed additives 200t Made from a blend of natural plant extracts

3. Production Quota and Work System

The total number of employees in this project is 15 people, all of whom are recruited nearby. They work 8 hours a day and work 300 days a year without providing board and lodging.

4. Production Equipment and Raw Materials

The main raw and auxiliary materials of this project are shown in Table 3, and the main equipment is shown in Table 4.

Table 3 Main raw and auxiliary materials

Product Category Name of raw materials Quantity form source Place of purchase Form and packaging Storage location
 
Feed additives
Alfalfa extract 18 tons/year Powdery Outsourcing Shijiazhuang Haili Pharmaceutical Bagged  
 
 
 
 
 
 
 
Plant raw materials storage area
Sugar terpenes 4 tons/year Powdery Outsourcing Shijiazhuang Haili Pharmaceutical Bagged
Epimedium extract 4 tons/year Powdery Outsourcing Shijiazhuang Haili Pharmaceutical Bagged
Perilla Seed Extract 4 tons/year Powdery Outsourcing Shijiazhuang Haili Pharmaceutical Bagged
Eucommia Leaf Extract 18 tons/year Powdery Outsourcing Shijiazhuang Haili Pharmaceutical Bagged
Sweet orange peel extract 13 tons/year Powdery Outsourcing Shijiazhuang Haili Pharmaceutical Bagged
Ramie Root and Leaf Extract 4 tons/year Powdery Outsourcing Shijiazhuang Haili Pharmaceutical Bagged
Acacia Flower Extract 8 tons/year Powdery Outsourcing Shijiazhuang Haili Pharmaceutical Bagged
Portulaca extract 4 tons/year Powdery Outsourcing Shijiazhuang Haili Pharmaceutical Bagged
Dandelion extract 4 tons/year Powdery Outsourcing Shijiazhuang Haili Pharmaceutical Bagged
Tea extract 4 tons/year Powdery Outsourcing Shijiazhuang Haili Pharmaceutical Bagged
Magnolia Bark Extract 4 tons/year Powdery Outsourcing Shijiazhuang Haili Pharmaceutical Bagged
Poplar Flower Extract 8 tons/year Powdery Outsourcing Shijiazhuang Haili Pharmaceutical Bagged
Wild Chrysanthemum Extract 8 tons/year Powdery Outsourcing Shijiazhuang Haili Pharmaceutical Bagged
Compound plant extract 100 tons/year Powdery Outsourcing Shijiazhuang Haili Pharmaceutical Bagged
corn starch 0.1 tons/year Powdery Outsourcing \ Bagged
Additive premix feed Bran, wheat bran, etc. 900 tons/year Powdery Outsourcing \ Bagged
Compound plant extract 100 tons/year Powdery Outsourcing Shijiazhuang Haili Pharmaceutical Bagged

Note: All raw and auxiliary materials of this project are purchased out, and the project does not involve the production of raw and auxiliary materials.

Table 4 List of main equipment

Production plant equipment
Serial number name model unit Quantity
1 Coating machine DWY-3 station 1
2 Granulator SET-100 station 1
3 Premixer JN-100v station 1
4 Complete equipment for premix production SSHJ500 set 1
5 Mobile dust collector SH-C16 station 3
6 Packaging Equipment CY-F01 set 1
7 Sealer FR-900 station 1
Bag filter TBLMD20 station 3
Laboratory equipment
1 High-speed Chinese medicine grinder 200g station 1
2 Electronic balance FA1004N station 1
3 Rotary evaporator RE-52 type station 1
4 Electric heating constant temperature drying oven 101-1 type station 1
5 Muffle furnace 2.5-10 station 1
6 Magnetic stirrer 220V-50HZ station 1
7 Vacuum drying oven DZF-1B type station 1
8 Digital display constant temperature water bath HH-S4 station 1
9 Fume hood - station 2

The above is the article for you: Investment Cost and Floor Space of Premixed Feed and Feed Additive Production Line Project.

If you are interested in our products or project solutions, please contact us. We will give you the best product quality and the best price. Email: enquiry@pellet-richi.com


PROJECT

RELATED PROJECT

Contact Us

GET A QUOTATION

Application:

Demands: (Submit your requirement here, eg. equipment, materials, product type, production size, etc.)

* We will store the information you have provided us. We will only use this information for the purpose of helping to answer your inquiries. We will not disclose your information to third parties.

Copyright © 2015-2023 by HENAN RICHI MACHINERY CO,LTD.All rights reserved.
×
Fill Out The Form To Get Quotation