We believe that service is key to your success. This is why at RICHI MACHINERY we continue building our service team across the global.
As your project execution expert, we provide complete oversight from concept to start-up. Internally executing all pellet production line project steps, from planning and engineering to fabrication and construction, our strategic EPC approach provides you with the project supply chain certainty that keeps project life cycles intact while also reducing owner's cost.
01
Evaluation
02
Design
03
Manufacturing
04
Civil Engineering
05
Installation
06
Training
07
After-sales Support
Pellet production line project success requires an integrated approach to consider all aspects of the project lifecycle, from initial planning to construction and operation. We understand the importance of this integrated approach and have applied it successfully for over 30 years.
As a top pellet plant engineering firm, we bring extensive expertise to each project, starting with detailed design engineering and project scopes during front-end planning and continuing to project controls that span every implementation stage.
Request a Proposal
With over 30 years of experience, we can identify issues and provide effective solutions in your
pellet production lines. We can advise on a consultancy basis whether you have questions about the
right solution for your problem, or simply want to better understand the options available to
you.
Our consulting services ability to understand operational challenges and apply
the right pellet plant solutions from a range of technical disciplines sets us apart from our
competition.
When we begin a new design-build construction project, our team will plan out and analyze every
aspect of the proposed design to make sure it will elevate your current business model and address
specific concerns in the production process.
Every aspect of the planning phase is
designed with your business in mind, so you can eliminate any potential bottlenecks or delays ahead
of time.

Our team at RICHI manages every aspect of the pellet plant build process, including the design,
planning, engineering, and construction of your new system.
With expertise across the
agricultural, industrial and manufacturing industries, we can create a custom solution for your
facility. These systems are made with the latest technological trends and industry standards in
mind, ensuring optimal efficiency at every turn.

Our team goes above and beyond the competition to make sure you have access to the best equipment
specifications for the job at hand.
Our self-designed and manufactured products are all
made to meet the regulations and quality requirements of various countries, which applies to the
execution of different types of feed mills and pellet plants. These requirements ensure that that
appropriate controls are in place at every stage of the manufacturing of products and systems for
your business.

After the equipment is processed, in order to allow customers to fully understand the quality and
operation of the new equipment, as a provider of professional granular equipment and engineering
overall solutions, we can not only provide customers with testing services from a single unit to a
complete system (Including all hosts and auxiliary equipment).
In addition, in the early
stage of equipment procurement, we also obtain the real data of customer raw materials through
quality inspection equipment (mainly for biomass raw materials), so as to have a clearer
understanding of equipment effects (such as compression ratio, output, pass-through rate, etc.).

RICHI MACHINERY has been working hard to make every detail perfect, especially in the equipment
preparation and shipment stage.
Before the equipment is packed and shipped, the order
specialist will check the packing list one by one to avoid missing or under-shipping. In the
equipment packing and packaging, we use professional packaging and modular solutions to ensure the
safe and damage-free delivery of the equipment.

We offer comprehensive steel detailing and drafting services, encompassing detailed drawings,
erection plans, shop drawings, isometric details, fabrication cut sheets, weld procedures, quality
control documentation, and powder coating. Our engineering specialists utilise advanced technology
to ensure product longevity, with additional services also available.
Regardless of
what you're looking to achieve, you've come to the right place. We specialize in
construction management, maintenance, and engineering to create pellet plant facilities in the feed,
biomass, organic fertilizer, and more industries that are built to last.

According to customer needs, Richi Machinery installation engineers will guide the construction of
site infrastructure, equipment installation and commissioning, and trial operation of the entire
pellet production line. When the relevant project indicators meet the design standards, the customer
will sign the project and pass the acceptance.
Our installers are dedicated to seamlessly
delivering and setting up your machinery on site, mitigating any potential disruptions in your
operations. With years of experience in the pelleting industry we are used to working in all types
of spaces to ensure the successful installation of equipment tailored to your specific needs.

RICHI accompanies you before, during and after our projects. We train on-the-job but also at our
workshop which centrally gathers expertise and systematically analyzes the experiences of our
worldwide active experts and our clients to constantly expand your knowledge.
We partner
with our customers on their automation journeys and leverage our extensive experience,
state-of-the-art technology, and consultative approach to build automation solutions that solve each
customer’s unique manufacturing challenges.

With continually rising demand and quality standards, many pellet manufcturers are struggling to cope
and have significant engineering challenges. Timely repairs and maintenance are critical to avoid
costly downtime and disruption.
If a piece of equipment or an existing system needs
repairs, our team will analyze the situation and propose a solution that works for your business.
From troubleshooting to expansive remodeling, we will address the problem in terms you can
understand, while minimizing any disruptions to your business.

We develop efficient pellet plant solutions for businesses across industries, placing emphasis on
customer perspectives and delivering the best-value, best-fit solutions. As industry partners with
leaders like ABB, Rockwell Automation, Siemens, etc., we engineer custom solutions in-house for
specific challenges.
As an experienced automation solutions provider, we understand the
unique and urgent challenges facing the manufacturing industry. No matter the business challenge,
our team of engineers provides brilliant, customized automation solutions that increase productivity
and profitability.

With RICHI equipment, you're getting more than a machine. You're investing in quality parts
and service. That's the part that matters. RICHI manufactures almost all parts and tooling
used within their equipment. That means every component serves a unique purpose within your
machine's unique engineered design. Trust RICHI components to optimize the performance of your
machine.
RICHI parts are made from high-quality materials using rigorously-tested
manufacturing techniques. Parts are designed based on customer feedback. We consistently work to
improve designs to help maximize part life.

Many of our customers have used RICHI Machinery in the past. The relationships developed are those of
mutual respect and admiration. Like new construction jobs, we design and implement a plan based upon
budget, time, space, and specifications. Unlike new construction, our familiarity with the job site
is second nature and the customer feels like family.
When working on a facility expansion
and/or renovation for a new customer, we take the time to understand the facility as if it was our
own. We familiarize ourselves with the production load, layout of the structure, and equipment
needed to complete the job.
RICHI MACHINERY
Lifecycle Support for Pellet Processing.
Partner With Us to Drive Innovation and Sustainability in Pellet
Production.
Humble and wholehearted. This is who we are and why we are different. We are here for you – across the entire life cycle, whether hardware or software. We provide you timely, flexible and convenient services and support . Thanks to our global service network, there is no need to worry about shortages of machines and spare parts.

01
RICHI invests into processing equipment, high tech process technology, hardware, software, and training yearly to keep our competitive edge on advanced pellet plant solutions.
02
RICHI has provided quality industrial engineering solutions and engineering services for the manufacturing and distribution markets for over 30 years and pride ourselves on the ability to meet and exceed our clients ' goals.
03
We've completed projects for 2000+ clients in over 60 industries across 140 + countries. Our 1-160t/h pellet production line projects range from $20,000 to $5 million and everything in between.
04
Value-added pellet line solutions that will positively affect your bottom line. Our solutions are designed to pay for themselves several times over through direct cost savings and/or cost avoidance.






Ready For A Quote?
Contact us for more information.
○ RICHI MACHINERY
Keeping in touch with us is an effective way to solve all your problems. If you have any needs or questions, please leave your contact information, then RICHI technical consultants will send design, quotation, videos to your mailbox. You can also contact us directly via WhatsApp: +86 13838389622
Copyright©2015-2026 by HENAN RICHI MACHINERY CO., LTD. All rights reserved.